Skip to the content
WGL Agentic

Quote it once. No retyping.

Picture a counter where every quote is typed twice: once for the customer, once into an old order system.

Typed once, for the customer

Hex bolt M10 × 60, zinc plated × 6 136.50

Typed again, for the old order system

D0001HB-1060-Z 0000060000002275000000012967T0000001070

The same line of the same quote. Below, you type it once.

A working example you can try

A demonstration. Northmoor Fastener Supply, its customer, products, prices, accounts and tax rate are invented. Nothing you type is kept.

Find a product

Showing 6 of 24 products.

  • Anchor bolt M10 × 100 AB-1010 Box of 25 5 or more: 30.75 each Unit price 34.15
  • Anchor resin, 300 ml cartridge CA-0850 Each 12 or more: 13.20 each Unit price 14.95
  • Cutting disc 115 × 1.0 mm CD-1151 Tin of 10 10 or more: 10.95 each Unit price 12.60
  • Local delivery, next working day DL-LOCAL Per drop Unit price 15.00
  • Ear plugs, foam EP-200 Box of 200 pairs 5 or more: 21.50 each Unit price 23.90
  • Flap disc 115 mm, 80 grit FD-1158 Each 20 or more: 2.95 each Unit price 3.45

Build the quote

Northmoor Fastener Supply

The quote is empty.

Add a product from the list and it lands here, with its totals.

Start again from the example

Hand it to the old order system

No file is written for an empty quote. Add a line and it is written here, row by row.

The old system reads one kind of file: 80 characters to a line, every figure in a fixed place. This is the file your staff would otherwise retype by hand.

Every column, by position
A demo layout, defined for this demonstration. On a real job it is whatever your old system already accepts.
RecordColumnsHolds
* Note1Record type
* Note2–80A note the old system skips. Here it says the file is a demonstration.
H Header1Record type
H Header2–11Quote number
H Header12–19Date: year, month, day
H Header20–27Account code
H Header28–31Number of lines
H Header32–80Blank
D Line1Record type
D Line2–5Line number
D Line6–19Product code
D Line20–25Quantity
D Line26–35Unit price, in cents
D Line36–47Line amount after discount, in cents
D Line48Tax code: T taxed, N not taxed
D Line49–58Tax, in cents
D Line59–80Blank
T Trailer1Record type
T Trailer2–5Number of lines
T Trailer6–13Total quantity
T Trailer14–25Amount after discount, in cents
T Trailer26–37Tax, in cents
T Trailer38–49Quote total, in cents
T Trailer50–57Control total
T Trailer58–80Blank

The quote is empty.

See the quote

The proof that comes with it

How you know it is right

You should not have to take our word for it. The tests below are real. They ran on this tool, on this website, at the time shown.

  1. The three quotes the customer worked out by hand come out the same, to the cent.

    Checked. Passed: 3 of 3.

  2. The correction from the first preview is now a permanent test.

    Checked. Passed: 1 of 1.

  3. The old system takes the file, and refuses a damaged one.

    Checked. Passed: 6 of 6.

A real run. Last run . 22 of 22 tests passed.

See the tests: all 22, with what was expected and what came back

The checklist

What the customer in this demonstration asked for, in plain words. A line is met only when the tests named beside it pass.

  1. Counter staff can find a product by its code or by its name.Proved by F01 F02 Met
  2. The quantity price applies from the break quantity, and not before.Proved by C01 C02 Met
  3. The account discount is rounded on each line. This was the customer’s correction after the first preview, and it became a test.Proved by C03 Met
  4. The three quotes the customer worked out by hand come out the same, to the cent.Proved by S01 S02 S03 C04 Met
  5. A mistyped quantity keeps its line, is flagged, and holds the file. An unknown code is refused. Nothing is guessed.Proved by C05 C06 C07 Met
  6. The old order system accepts the export, and refuses a damaged one.Proved by E01 E02 E03 E04 E05 E06 Met
  7. The price list in the tool is the price list that was sent: the same rows, the same codes, the same total.Proved by R01 R02 R03 Met
  8. The figures are the same on any phone or computer, old or new.Proved by P01 Met

Checked against the customer’s own figures

Line by line: the same products, the same number of rows, the same totals. If any of these differ, the tool does not go out.

The price list: as sent, and as it now sits in the tool
Measure As sent In the tool Result
Rows2424Agrees
Product codes, as one check figure3A11A75F3A11A75FAgrees
Sum of list prices321.70321.70Agrees
The sample quotes: the customer’s figure, the tool’s figure and the old system’s receipt
Sample quote Codes matched Customer’s figure Tool’s figure Receipt Result
A · counter sale3 of 3148.84148.84148.84Agrees
B · trade account4 of 4154.41154.41154.41Agrees
C · contract account3 of 3360.82360.82360.82Agrees

Every test

Each one states what was expected and what the tool gave.

The calculation

  1. C01Below the quantity break, the list price is chargedExpected 10.00Got 10.00Pass
  2. C02At the quantity break, the quantity price is chargedExpected 9.00Got 9.00Pass
  3. C03The discount is rounded on each line: three lines of 0.10 at 5% offExpected 0.03Got 0.03Pass
  4. C04Tax is added to taxed lines only, and a half cent rounds upExpected 0.83Got 0.83Pass
  5. C05Three mistyped quantities on three lines: flagged / lines kept / total in cents, unchanged / file held (1 is yes)Expected 3 / 3 / 2040 / 1Got 3 / 3 / 2040 / 1Pass
  6. C06An unknown product code: refused (1 is yes) / lines added / cents added to the totalExpected 1 / 0 / 0Got 1 / 0 / 0Pass
  7. C0710,000 typed on a line of 5: quantity kept / file held (1 is yes)Expected 5 / 1Got 5 / 1Pass

The customer’s sample totals

  1. S01Sample quote A comes to the customer’s own figureExpected 148.84Got 148.84Pass
  2. S02Sample quote B comes to the customer’s own figureExpected 154.41Got 154.41Pass
  3. S03Sample quote C comes to the customer’s own figureExpected 360.82Got 360.82Pass

The file for the old system

  1. E01Every record in the file is this many characters wideExpected 80Got 80Pass
  2. E02Header count / lines read / trailer countExpected 4 / 4 / 4Got 4 / 4 / 4Pass
  3. E03Product codes come back in the order they were sentExpected WS-4040 SS-310C GL-N09 DL-LOCALGot WS-4040 SS-310C GL-N09 DL-LOCALPass
  4. E04The trailer total is the customer’s figureExpected 154.41Got 154.41Pass
  5. E05A good file is accepted and a file with one digit changed is refused (1 is accepted, 0 is refused)Expected 1 / 0Got 1 / 0Pass
  6. E06The first line says it is a demonstration, and the reader skips it: first character / notes skipped / lines readExpected * / 1 / 4Got * / 1 / 4Pass

Finding a product

  1. F01A code typed without its dash finds the productExpected HB-0840-ZGot HB-0840-ZPass
  2. F02Words in any order, in capitals or not, find the one productExpected SS-310CGot SS-310CPass

The price list

  1. R01Every row of the price list arrivedExpected 24Got 24Pass
  2. R02The product codes are the same set: check figureExpected 3A11A75FGot 3A11A75FPass
  3. R03The list prices add up to the same figureExpected 321.70Got 321.70Pass

One calculation, however you reach it

  1. P01The calculation on its own and the finished page give the same totalExpected 360.82Got 360.82Pass

On a real job, the person who answers for the work signs this before you see it.

And it is yours. The source, the tests, the checklist and this record are handed over with the tool, so any future team can pick it up.

Write to us and a person will walk you through the quote tool, with its checklist and its tests.

On your job, the figures are yours

On a real job the figures are not ours. They are yours: your price list, your tax rule, a few quotes you have worked out by hand, and your old system’s own receipt. Your totals become the tests, and your old system’s receipt is the final proof.

You keep the tools you trust. Your staff get the one they were missing.

Your price list

HB-1060-ZHex bolt M10 × 60, zinc plated22.75
HN-10-ZHex nut M10, zinc plated12.90
SW-10-SSpring washer M10, stainless16.85
24 rows, as you keep them now

Quotes you worked by hand

A · counter sale148.84
B · trade account154.41
C · contract account360.82
Each one becomes a test the tool must pass

Your old system’s receipt

Lines3 sent, 3 read
Total289.28 sent, 289.28 read
ResultAccepted
The last word on whether the file is right

Send us the price list your counter retypes from.

[email protected]

What to send, and what happens to it